Two Scrum meeting helpers, offline and with no AI (models/lib/scrumMeetings.js, docs/Features/Scrum/Meetings.md): - Daily standup: the board's active members in a shuffled order, each with the same timebox (Minutes per person in the Scrum settings, 1-15, 2 by default), counted down and red once over; Next hands over, and the end says how long it took. It runs in the browser and writes nothing. - Retrospective board: a new private board, titled with this board's name and the day, with the lists Start doing, Stop doing, Keep doing and Action items, made through createBoardWithInitialSwimlanes so "who may create boards" applies. Both are in the board menu for every member, next to Summary. Each is turned off for one board in its Scrum settings and for the instance in Admin Panel / Settings / Visibility / Features. Translated in every language. Thanks to xet7 !
4.1 KiB
See also the native Scrum source audit and implementation design. The design distinguishes existing features from planned additions.
A reporter asked for tips on running a basic Scrum process on WeKan: cards as user stories, story points, acceptance-test checklists, one board per sprint, and a separate planning/backlog board. All of that is possible with WeKan's existing features - no plugin or extra setup is needed. This page lays out one concrete mapping; adapt it to how your team already works.
Cards as user stories
A card is the natural unit for a user story: title it the way the team writes stories ("As a user, I can ..."), and use the card description for the rest of the story text. Story acceptance criteria fit best as a checklist on the card (see Checklists) - each acceptance test becomes one checklist item, and the card's checklist-progress badge on the minicard shows how many are done without opening the card.
Story points as a numeric custom field
Add a numeric Custom Field (for example
named "Story Points") at board level, and attach it to the card types you
use for stories. Custom fields also support a "show sum at top of list"
toggle (models/customFields.js's showSumAtTopOfList) - turn it on and
the list header draws a "∑ n" badge next to the card-count badge, totalling
that field over the cards in the list. In Swimlanes view the same list is
drawn once per swimlane row, and the badge is scoped to the row it is
drawn in, so a story-point sum next to a sprint's "Doing" or "Done" list
reads as that swimlane's own total, not the whole board's - useful for a
rough velocity number without a separate burndown tool. See
Burndown and Velocity Chart
for existing burndown options if a graph is wanted on top of the sum.
One board (or swimlane) per sprint
Either works, and the tradeoff is the same one Scrum teams already weigh outside WeKan:
- A board per sprint keeps each sprint's cards, lists and history completely separate, and a finished sprint's board can simply be archived (see Archive and Delete). Templates let a new sprint board start from a saved list/swimlane layout instead of being rebuilt from scratch every time.
- A swimlane per sprint on one long-lived board keeps all sprints visible side by side, and the numeric custom-field sum badge described above is naturally scoped per swimlane, so several sprint rows on the same board each show their own point total. See Swimlanes.
Either way, Card Dependencies ("Red Strings") and Linked Cards can connect a story on a sprint board back to its source card on the backlog/planning board below.
A backlog / planning board
A separate board (or a "Backlog" list on the same board) holds stories not yet committed to a sprint. Move or copy a card into the active sprint board/swimlane when it is pulled into a sprint - WeKan's Drag Drop and "move card to board" actions both work across boards. WIP Limits on the sprint board's "Doing" list give a simple check against overcommitting mid-sprint.
What this does not cover
This is a manual mapping of Scrum concepts onto WeKan's existing card, checklist, custom-field and swimlane/board features - WeKan has no purpose-built "sprint" or "story points" object, velocity chart, or sprint-close/rollover action. If your team needs one of those built in rather than assembled this way, please open a feature request describing the exact workflow.
Meetings
The board menu's Daily standup timer and Retrospective board help with the daily standup and the sprint retrospective, and the flow policies page describes the Definition of Ready beside the Definition of Done.