Two Scrum meeting helpers, offline and with no AI (models/lib/scrumMeetings.js, docs/Features/Scrum/Meetings.md): - Daily standup: the board's active members in a shuffled order, each with the same timebox (Minutes per person in the Scrum settings, 1-15, 2 by default), counted down and red once over; Next hands over, and the end says how long it took. It runs in the browser and writes nothing. - Retrospective board: a new private board, titled with this board's name and the day, with the lists Start doing, Stop doing, Keep doing and Action items, made through createBoardWithInitialSwimlanes so "who may create boards" applies. Both are in the board menu for every member, next to Summary. Each is turned off for one board in its Scrum settings and for the instance in Admin Panel / Settings / Visibility / Features. Translated in every language. Thanks to xet7 !
82 lines
4.1 KiB
Markdown
82 lines
4.1 KiB
Markdown
See also the [native Scrum source audit and implementation design](../Board-Header/Board-Views/Scrum/Scrum-Design.md). The design distinguishes existing features from planned additions.
|
|
|
|
[Discussion](https://github.com/wekan/wekan/issues/3087)
|
|
|
|
A reporter asked for tips on running a basic Scrum process on WeKan: cards
|
|
as user stories, story points, acceptance-test checklists, one board per
|
|
sprint, and a separate planning/backlog board. All of that is possible with
|
|
WeKan's existing features - no plugin or extra setup is needed. This page
|
|
lays out one concrete mapping; adapt it to how your team already works.
|
|
|
|
## Cards as user stories
|
|
|
|
A card is the natural unit for a user story: title it the way the team
|
|
writes stories ("As a user, I can ..."), and use the card description for
|
|
the rest of the story text. Story acceptance criteria fit best as a
|
|
**checklist** on the card (see [Checklists](../../API/Checklists.md)) -
|
|
each acceptance test becomes one checklist item, and the card's
|
|
checklist-progress badge on the minicard shows how many are done without
|
|
opening the card.
|
|
|
|
## Story points as a numeric custom field
|
|
|
|
Add a numeric [Custom Field](CustomFields/CustomFields.md) (for example
|
|
named "Story Points") at board level, and attach it to the card types you
|
|
use for stories. Custom fields also support a "show sum at top of list"
|
|
toggle (`models/customFields.js`'s `showSumAtTopOfList`) - turn it on and
|
|
the list header draws a "∑ n" badge next to the card-count badge, totalling
|
|
that field over the cards in the list. In Swimlanes view the same list is
|
|
drawn once per swimlane row, and the badge is scoped to the row it is
|
|
drawn in, so a story-point sum next to a sprint's "Doing" or "Done" list
|
|
reads as that swimlane's own total, not the whole board's - useful for a
|
|
rough velocity number without a separate burndown tool. See
|
|
[Burndown and Velocity Chart](../Board-Header/Board-Views/Charts/Burndown-and-Velocity-Chart.md)
|
|
for existing burndown options if a graph is wanted on top of the sum.
|
|
|
|
## One board (or swimlane) per sprint
|
|
|
|
Either works, and the tradeoff is the same one Scrum teams already weigh
|
|
outside WeKan:
|
|
|
|
- **A board per sprint** keeps each sprint's cards, lists and history
|
|
completely separate, and a finished sprint's board can simply be
|
|
archived (see [Archive and Delete](../Board-Sidebar/Archive/Archive-and-Delete.md)).
|
|
[Templates](../All-Boards/Templates.md) let a new sprint board start from a
|
|
saved list/swimlane layout instead of being rebuilt from scratch every
|
|
time.
|
|
- **A swimlane per sprint** on one long-lived board keeps all sprints
|
|
visible side by side, and the numeric custom-field sum badge described
|
|
above is naturally scoped per swimlane, so several sprint rows on the
|
|
same board each show their own point total. See
|
|
[Swimlanes](../Swimlanes/Swimlanes.md).
|
|
|
|
Either way, [Card Dependencies ("Red Strings")](../General/Editor/RedStrings/RedStrings.md)
|
|
and [Linked Cards](Linked-Cards.md) can connect a story on a sprint board
|
|
back to its source card on the backlog/planning board below.
|
|
|
|
## A backlog / planning board
|
|
|
|
A separate board (or a "Backlog" list on the same board) holds stories not
|
|
yet committed to a sprint. Move or copy a card into the active sprint
|
|
board/swimlane when it is pulled into a sprint - WeKan's
|
|
[Drag Drop](../General/DragDrop/Drag-Drop.md) and "move card to board" actions
|
|
both work across boards. [WIP Limits](../Lists/WipLimit/WipLimit.md) on
|
|
the sprint board's "Doing" list give a simple check against overcommitting
|
|
mid-sprint.
|
|
|
|
## What this does not cover
|
|
|
|
This is a manual mapping of Scrum concepts onto WeKan's existing card,
|
|
checklist, custom-field and swimlane/board features - WeKan has no
|
|
purpose-built "sprint" or "story points" object, velocity chart, or
|
|
sprint-close/rollover action. If your team needs one of those built in
|
|
rather than assembled this way, please open a feature request describing
|
|
the exact workflow.
|
|
|
|
## Meetings
|
|
|
|
The board menu's [Daily standup timer and Retrospective board](../Scrum/Meetings.md)
|
|
help with the daily standup and the sprint retrospective, and the
|
|
[flow policies](../Lists/Flow-Policies.md) page describes the Definition of
|
|
Ready beside the Definition of Done.
|