Files
wekan/docs/Features/Lists/Flow-Policies.md
T
Lauri Ojansivu fd5c207006 Lists split into Doing and Done.
A list can be split into Doing and Done (models/lib/boardFlowPolicies.js):
a card of it marked Done here, with the circle at its minicard's corner,
waits dimmed and edged green to be pulled into the next list, and the
list header counts Doing and Done. The mark names the list it was made in
(card.flow.splitDoneListId, written by setCardFlow from the card's own
list, and only in a split list), so a card moved on is in Doing of its new
list without anybody clearing it.

A board admin allows split lists in Board Settings / List, and each list
is split from its menu. Admin Panel / Settings / Visibility / Features /
Split lists hides it on every board. Translated in every language.

Thanks to xet7 !
2026-11-20 09:16:10 +02:00

2.5 KiB

Flow policies: list policies, split lists, commitment point, WIP limit per person

Three Kanban practices for a board's lists, offline and with no AI (models/lib/boardFlowPolicies.js). They are taken from the Kanban Guide's practices make policies explicit and limit work in progress.

Practice What it does
List policy Each list's own policy: when a card may come into it and when it is done there. Written from the list menu, List policy; shown as a gavel at the list header, its tooltip the text. Any member who may edit lists may write it.
Commitment point The list from which work is committed to; the lists before it are options. That list's header carries a green flag.
Split list A list split into Doing and Done: a card of it marked Done here (the circle at its minicard's corner) waits, dimmed and edged green, to be pulled into the next list, and the header counts Doing n · Done m. Turned on for a list in its menu, Split into Doing and Done. The mark belongs to the list it was made in, so a card moved on is in Doing of its new list.
WIP limit per person How many open cards (not done, not archived) one person may hold on the board, counting a card's assignees, or its members when nobody is assigned. An opened card names each of its people over the limit, in its Members section.

Turning them on, and hiding them

All four are off until a board admin turns them on, in Board Settings / List: Show list policies, Allow lists split into Doing and Done, Commitment point (a list, or none) and WIP limit per person (1-99, empty for none).

Each is also a feature of Admin Panel / Settings / Visibility / Features: List policies, Split lists, Commitment point, WIP limit per person. Turned off there, it is not offered in Board Settings and not drawn on any board; nothing a board set is deleted, so turning it on again shows every board as it was. Feature profiles can hide them for some users only.

Definition of Ready

Beside the Definition of Done, the Scrum settings have a Definition of Ready: when a backlog item may be taken into a sprint. Both are shown to every member in the Scrum views once written, and nothing is drawn while they are empty; Admin Panel / Features / Scrum views hides them with the views.

Tests: tests/boardFlowPolicies.test.cjs, tests/playwright/specs/list-flow-policies.e2e.js, tests/playwright/specs/scrum-definition-of-ready.e2e.js.