mirror of
https://github.com/wekan/wekan.git
synced 2026-11-24 09:59:47 -05:00
The rspack client build treats a `module.exports` file imported into the
client bundle as an ES module and throws
"ES Modules may not assign module.exports" at evaluation time, aborting
the whole client module chain (No such template: swimlane / notifications
/ boardButtons, blank board, missing top bar). This is not an rspack
version regression (the lockfile has pinned ~1.7.x since v8.40); it is
that WeKan added CommonJS helpers to the client bundle.
Convert the 42 client-reachable pure-logic models/lib helpers from
`module.exports = { ... }` to `export { ... }`, and calendarFilter's
internal require('./swimlaneFilter') to an import with a .js extension
(node ESM needs it; rspack/reify tolerate it). Server-only helpers that
use node built-ins (fs/path/child_process) stay CommonJS. The plain-Node
.cjs unit tests for these helpers now use `await import(...js)` (wrapped
in an async IIFE); a source-guard in importVirtualMembers was updated
from module.exports to export. Verified: the full tests/*.test.cjs suite
has the SAME 7 pre-existing failures as before this change and no new
ones.
84 lines
3.3 KiB
JavaScript
84 lines
3.3 KiB
JavaScript
'use strict';
|
|
|
|
// Shared week-start / week-number math that respects the user's configured
|
|
// "start day of week" (0 = Sunday .. 6 = Saturday, matching JS Date.getDay()
|
|
// and the Users.getStartDayOfWeek() setting). Meteor-free so it can be unit
|
|
// tested with plain Node.
|
|
//
|
|
// Used by:
|
|
// - #4881 ("duedate filter & week number"): the "Due this week" / "Due next
|
|
// week" date filter in client/lib/filter.js. The old code computed the
|
|
// window from `startOf(date, 'week')`, but the native dateUtils.startOf()
|
|
// has NO `case 'week'`, so it returned the date unchanged and the window
|
|
// started at "today + startDayOfWeek" — i.e. it selected NEXT week's cards
|
|
// for "this week". It also ignored which weekday the user starts on.
|
|
// - #4946 ("Is week numbers respecting defined start day of week?"): the
|
|
// calendar-view week-number column, which used FullCalendar's locale default
|
|
// and numbered weeks from Sunday regardless of the configured start day.
|
|
|
|
// Local midnight of `date`, as a new Date (does not mutate the input).
|
|
function atMidnight(date) {
|
|
const d = new Date(date.getTime());
|
|
d.setHours(0, 0, 0, 0);
|
|
return d;
|
|
}
|
|
|
|
// A UTC-based day index for `date`'s calendar day. Used for day counting so the
|
|
// arithmetic is immune to daylight-saving-time hour shifts.
|
|
function utcDayNumber(date) {
|
|
return Math.floor(
|
|
Date.UTC(date.getFullYear(), date.getMonth(), date.getDate()) / 86400000,
|
|
);
|
|
}
|
|
|
|
// Normalize a start-day-of-week setting to an integer 0..6 (default Monday = 1).
|
|
// null / undefined / '' fall back to the default rather than coercing to 0
|
|
// (Number(null) === 0 would otherwise silently mean Sunday).
|
|
function normalizeFirstDay(firstDay) {
|
|
if (firstDay === null || firstDay === undefined || firstDay === '') return 1;
|
|
const n = Number(firstDay);
|
|
if (!Number.isFinite(n)) return 1;
|
|
return ((Math.trunc(n) % 7) + 7) % 7;
|
|
}
|
|
|
|
// The most recent `firstDay` weekday at 00:00 on or before `date` — the first
|
|
// day of the week that contains `date`, for an arbitrary week start.
|
|
function startOfWeek(date, firstDay) {
|
|
const fd = normalizeFirstDay(firstDay);
|
|
const d = atMidnight(date);
|
|
const delta = (d.getDay() - fd + 7) % 7;
|
|
d.setDate(d.getDate() - delta);
|
|
return d;
|
|
}
|
|
|
|
// { start, end } Date pair for the week `weekOffset` weeks from the week that
|
|
// contains `date` (0 = this week, 1 = next week). `start` is 00:00 of the
|
|
// week's first day; `end` is 23:59:59.999 of its last day.
|
|
function weekRange(date, firstDay, weekOffset = 0) {
|
|
const start = startOfWeek(date, firstDay);
|
|
start.setDate(start.getDate() + weekOffset * 7);
|
|
const end = new Date(start.getTime());
|
|
end.setDate(end.getDate() + 6);
|
|
end.setHours(23, 59, 59, 999);
|
|
return { start, end };
|
|
}
|
|
|
|
// Week number aligned to `firstDay`: week 1 is the week (starting on firstDay)
|
|
// that contains January 1st, and the number increments on each firstDay. This
|
|
// generalizes the already-correct Sunday-start behavior to any start day, so
|
|
// the number shown matches the way the week grid is laid out.
|
|
function weekNumberByFirstDay(date, firstDay) {
|
|
const d = atMidnight(date);
|
|
const jan1 = new Date(d.getFullYear(), 0, 1);
|
|
const firstWeekStart = startOfWeek(jan1, firstDay);
|
|
const diffDays = utcDayNumber(d) - utcDayNumber(firstWeekStart);
|
|
return Math.floor(diffDays / 7) + 1;
|
|
}
|
|
|
|
export {
|
|
normalizeFirstDay,
|
|
startOfWeek,
|
|
weekRange,
|
|
weekNumberByFirstDay,
|
|
};
|