Files
wekan/tests/weekStart.test.cjs
T
Lauri Ojansivu 8d1fae4f7d Convert client-reachable models/lib helpers from CommonJS to ES modules (1/2).
The rspack client build treats a `module.exports` file imported into the
client bundle as an ES module and throws
"ES Modules may not assign module.exports" at evaluation time, aborting
the whole client module chain (No such template: swimlane / notifications
/ boardButtons, blank board, missing top bar). This is not an rspack
version regression (the lockfile has pinned ~1.7.x since v8.40); it is
that WeKan added CommonJS helpers to the client bundle.

Convert the 42 client-reachable pure-logic models/lib helpers from
`module.exports = { ... }` to `export { ... }`, and calendarFilter's
internal require('./swimlaneFilter') to an import with a .js extension
(node ESM needs it; rspack/reify tolerate it). Server-only helpers that
use node built-ins (fs/path/child_process) stay CommonJS. The plain-Node
.cjs unit tests for these helpers now use `await import(...js)` (wrapped
in an async IIFE); a source-guard in importVirtualMembers was updated
from module.exports to export. Verified: the full tests/*.test.cjs suite
has the SAME 7 pre-existing failures as before this change and no new
ones.
2026-07-23 18:55:30 +03:00

133 lines
5.3 KiB
JavaScript

'use strict';
(async () => {
// Plain-Node unit test (no Meteor) for the start-day-of-week math.
// Run: node tests/weekStart.test.cjs
//
// Regression guard for:
// - #4881 ("duedate filter & week number"): the "Due this week" / "Due next
// week" filter selected the WRONG week. The old filter derived its window
// from startOf(date, 'week'), but the native dateUtils.startOf() has no
// `case 'week'`, so it returned the date unchanged and the window began at
// "today + startDayOfWeek" — next week's cards showed for "this week". It
// also ignored the configured start weekday.
// - #4946 ("Is week numbers respecting defined start day of week?"): week
// numbers were computed Sunday-anchored regardless of the setting.
const assert = require('assert');
const {
normalizeFirstDay,
startOfWeek,
weekRange,
weekNumberByFirstDay,
} = await import('../models/lib/weekStart.js');
let passed = 0;
function test(name, fn) {
fn();
passed += 1;
console.log(' ok -', name);
}
const ymd = d => `${d.getFullYear()}-${String(d.getMonth() + 1).padStart(2, '0')}-${String(d.getDate()).padStart(2, '0')}`;
// Wednesday 2023-06-07.
const WED = new Date(2023, 5, 7, 15, 30, 0);
// --- normalizeFirstDay -------------------------------------------------------
test('normalizeFirstDay defaults to Monday (1) for junk', () => {
assert.strictEqual(normalizeFirstDay(undefined), 1);
assert.strictEqual(normalizeFirstDay(null), 1);
assert.strictEqual(normalizeFirstDay('nonsense'), 1);
});
test('normalizeFirstDay accepts 0..6 and wraps out-of-range', () => {
assert.strictEqual(normalizeFirstDay(0), 0);
assert.strictEqual(normalizeFirstDay('6'), 6);
assert.strictEqual(normalizeFirstDay(7), 0);
assert.strictEqual(normalizeFirstDay(-1), 6);
});
// --- startOfWeek: POSITIVE ---------------------------------------------------
test('Monday-start: week of Wed 2023-06-07 begins Mon 2023-06-05', () => {
assert.strictEqual(ymd(startOfWeek(WED, 1)), '2023-06-05');
});
test('Sunday-start: same Wednesday begins Sun 2023-06-04', () => {
assert.strictEqual(ymd(startOfWeek(WED, 0)), '2023-06-04');
});
test('Saturday-start: same Wednesday begins Sat 2023-06-03', () => {
assert.strictEqual(ymd(startOfWeek(WED, 6)), '2023-06-03');
});
test('startOfWeek is set to local midnight', () => {
const s = startOfWeek(WED, 1);
assert.strictEqual(s.getHours(), 0);
assert.strictEqual(s.getMinutes(), 0);
assert.strictEqual(s.getSeconds(), 0);
});
// --- weekRange: POSITIVE + the #4881 core regression -------------------------
test('this week (Monday-start) around Wed = Mon..Sun containing the day', () => {
const { start, end } = weekRange(WED, 1, 0);
assert.strictEqual(ymd(start), '2023-06-05');
assert.strictEqual(ymd(end), '2023-06-11');
});
test('next week (Monday-start) = the following Mon..Sun', () => {
const { start, end } = weekRange(WED, 1, 1);
assert.strictEqual(ymd(start), '2023-06-12');
assert.strictEqual(ymd(end), '2023-06-18');
});
test('week end is the last day at 23:59:59.999', () => {
const { end } = weekRange(WED, 1, 0);
assert.strictEqual(end.getHours(), 23);
assert.strictEqual(end.getMinutes(), 59);
assert.strictEqual(end.getSeconds(), 59);
});
test('NEGATIVE: "this week" must CONTAIN today, not start after it (#4881)', () => {
// The broken code produced a window that began at today+startDay (next week).
// Guard: today must fall within [start, end] of the "this week" range.
const { start, end } = weekRange(WED, 1, 0);
assert.ok(start <= WED && WED <= end, '"this week" must include today');
});
test('NEGATIVE: this-week and next-week windows do not overlap and are adjacent', () => {
const thisW = weekRange(WED, 1, 0);
const nextW = weekRange(WED, 1, 1);
assert.ok(thisW.end < nextW.start, 'this week ends before next week starts');
// exactly one day (the boundary) between end-of-this 23:59 and start-of-next 00:00
const gapMs = nextW.start - thisW.end;
assert.ok(gapMs > 0 && gapMs < 2 * 3600 * 1000, 'windows are adjacent');
});
test('NEGATIVE: a day ON the week-start boundary belongs to that week, not the previous one', () => {
// Sunday 2023-06-11 with Sunday-start must begin its OWN week (06-11), not 06-04.
const sunday = new Date(2023, 5, 11, 9, 0, 0);
assert.strictEqual(ymd(startOfWeek(sunday, 0)), '2023-06-11');
});
// --- weekNumberByFirstDay: #4946 ---------------------------------------------
test('week number respects the start day (Jan 1 2023 is a Sunday)', () => {
// Sunday-start: Jan 1 2023 (Sunday) is week 1; Jan 8 is week 2.
assert.strictEqual(weekNumberByFirstDay(new Date(2023, 0, 1), 0), 1);
assert.strictEqual(weekNumberByFirstDay(new Date(2023, 0, 8), 0), 2);
});
test('NEGATIVE: start day changes the number for Saturday 2023-01-07 (#4946)', () => {
// Jan 1 2023 is a Sunday. For Saturday 2023-01-07:
// Sunday-start -> same week as Jan 1 -> week 1
// Monday-start -> week began Dec 26 2022 -> week 2
// The number MUST track the configured start day; a Sunday-anchored constant
// (the #4946 bug) would report the same value for both.
const satJan7 = new Date(2023, 0, 7, 12, 0, 0);
assert.strictEqual(weekNumberByFirstDay(satJan7, 0), 1);
assert.strictEqual(weekNumberByFirstDay(satJan7, 1), 2);
});
console.log(`\n${passed} tests passed`);
})().catch(e => { console.error(e); process.exit(1); });