Lauri Ojansivu 58ad81e301 continuousBackup integration suite: stop each engine before its directory is removed.
Three tests registered the hook that removes their temp directory before the hook
that stops their engine. node:test runs after-hooks in the order they were
registered, not last-in first-out, so the directory was gone when stop() sealed
into it, and the ENOENT (files/index.ndjson) surfaced after the test as
"generated asynchronous activity after the test ended" - which failed the whole
suite although all 8 tests passed. One hook now stops the engine first and then
removes the directory. Five runs in a row, and the suite runner, pass.