mirror of
https://github.com/wekan/wekan.git
synced 2026-11-24 18:10:06 -05:00
As decided on 2026-10-02, a card or swimlane copied or moved to another board now takes that board's sprint and release of the same name when exactly one matches: a planned or active sprint, or a release that is not cancelled. Otherwise they are dropped, as before. Past sprints and backlog rank always go. This applies to card and swimlane copies, subtasks copied with their parent, the server hooks behind every move, and the durable rule copy and move. A move that sets the Scrum revision itself, as the durable rule move does, is left alone by the hook. Thanks to xet7 !
Right sidebar
Open the sidebar on a board. Its main view provides Board Settings, members, labels, a vertical-scrollbar preference and activities. Keyboard shortcuts and accessibility controls are available from the sidebar controls.
- Board Settings
- Members and permissions
- Labels and card content
- Keyboard shortcuts
- Accessibility
- Activity rendering
Show week of year (ISO 8601) is now in Board Settings / Date, below Save and a horizontal rule. It changes your week-number display preference.