Files
wekan/docs/Features/Summary
Lauri Ojansivu 7e1f9e89eb Docs: every feature topic in one folder under docs/Features, each with README.md as its main page.
- The General/ level is gone: its 109 files moved up into the folders of the
  same name, and its topic table is the "Shared topics" section of
  Features.md.
- Accessibility is one folder, docs/Features/Accessibility/, with the Admin
  Panel's accessibility page in it.
- Every folder's main page is README.md (110 X/X.md pages renamed with git mv,
  five merged with an existing README.md, 26 index pages added for folders
  that had none), so a folder opened on GitHub shows its page.
- The 73 "# Moved" forwarding pages are deleted, with the folders that held
  only them; every link that went to one goes to its final page.
- docs/Features/README.md has the website's "Features in WeKan" overview,
  each feature linking to its page here.

1,129 Markdown links in 262 files and 352 doc paths in code, tests, compose,
snap and release files follow. tests/docsFeaturesLayout.test.cjs fails when
General/ or a "# Moved" page comes back, a folder has no README.md, or a
relative link in the docs or README.md does not resolve.

Thanks to xet7 !
2026-11-24 20:02:06 +02:00
..

Summary

What it is

Board hamburger menu → Summary opens a right-sidebar view of what happened on this board, person by person - a standup report that writes itself. It answers "what did each of us do yesterday or this week, and what is overdue?" from the board's own records, with no AI.

Read more

How to use it

  1. Open a board.
  2. Open the board hamburger menu (the right sidebar) and click Summary.
  3. Choose Last day (the last 24 hours) or Last week (the last seven days).
  4. Read each member's groups; each card is a link that opens it.
  5. Click Copy as text to copy the whole summary as Markdown, ready to paste into a chat or an email. The button says Copied when it is done.

For each member who did something, or has cards overdue, in order of how much they did:

Group What counts
Done cards they marked complete, gave an end date, archived, or moved into the board's last list (of each swimlane, where lists belong to one)
Moved cards they moved to another list or swimlane, unless that move finished the card
Added cards they created
Commented cards they commented on
Overdue cards they are a member or assignee of whose due date has passed and that are not done - now, whatever the period

Hiding it. Admin Panel / Settings / Features: Summary.

How the numbers are calculated

From models/lib/boardSummary.js and server/methods/boardSummary.js:

  • The period. Last day is now - 24 * 60 * 60 * 1000 ms, last week now - 7 * 24 * 60 * 60 * 1000 ms (PERIODS, sinceFor()); a row counts when its createdAt is at or after that and not after now.
  • Done comes from activities archivedCard, and moveCard whose target list is a last list, plus History rows that set dueComplete to true or set a non-empty endAt. The last list is the active list with the highest sort, per swimlaneId (lastListIds()).
  • Moved is the other moveCard activities; a card in Done for that person is removed from Moved.
  • Added is createCard, Commented is addComment.
  • Each group counts a card once per person, however many times it happened; the number after a group name is the number of cards in it, and cards are sorted by title.
  • Overdue is computed now, not in the period: cards with a dueAt before now that are not done (dueComplete, an endAt or archived means done), for every member and assignee of the card.
  • Order of people. By their total of Done + Moved + Added + Commented (Overdue is not in the total), highest first; then by the number of overdue cards; then by username.
  • Limits. At most 20 000 cards, activities and History rows are read (MAX_ROWS); the method is rate-limited to 10 calls per 10 seconds per connection. Only active board members are listed.