Files
wekan/docs/Features/Cards/At-Risk.md
T
Lauri Ojansivu 407ad71e28 Docs: Cards: what each feature is, how to use it, how its numbers are calculated, how it works, and its commits.
Corrected from the code: card aging is in Board Settings / All Boards
Settings; Mark as complete is off by default on both sides; the checklist
menu says Edit as text and Automatic reset, whose Off is Off (do not reset
automatically); Card recurrence is under Move and copy in the card menu;
Reset width follows Create cards from action items; comment replies are
grouped under their parent and capped at one level; Admin Panel / Settings /
Features holds Card fields; the Card section lists Blocked, Class of
service, MoSCoW and WSJF.

Thanks to xet7 !
2026-11-22 18:23:33 +02:00

5.2 KiB

At risk

What it is

A card that looks like it will not get done in time gets an At risk mark: a small red triangle on the minicard, and in the opened card a line saying why. The mark is a weighted score of five plain rules - overdue, due soon with the checklist behind, blocked, idle, sent back - so anybody can read why a card was marked, instead of a prediction nobody can check. It needs no AI and no setup.

Read more

How to use it

See which cards are at risk

  1. Open a board. A minicard with a small red triangle is at risk.
  2. Click the minicard to open the card. Under Date, the At risk line lists every reason that applied, for example overdue; blocked by "Order parts".
  3. Fix what the reasons name - set a new due date, tick the checklist items, finish the blocking card, move the card on - and the mark goes away by itself.

Hide it

  1. Open the board's cog menu, Board Settings, then Card (Card Settings).
  2. In the Date section, untick the At risk row: in Show on Minicard for the triangle, in Show on Card for the line in the opened card.
  3. A site admin hides both on every board from Admin Panel / Settings / Features / Card fields.

How the numbers are calculated

From models/lib/cardRisk.js:

Reason Rule Points
Overdue the due date has passed and the card is not complete 3
Due soon due within two days (DUE_SOON_DAYS = 2) and less than half of its checklist items are done (finished / total < 0.5, only when it has checklist items) 2
Blocked another open card it depends on (is blocked by) is not done 2
Idle no activity for 14 days (IDLE_DAYS = 14), while not in the board's first or last list 2
Sent back moved to an earlier list twice or more (SENT_BACK_MOVES = 2) 1
  • The score is the sum of the points of the reasons that apply. A card with 3 points or more (THRESHOLD = 3) is at risk, so being overdue alone is enough, and any two of the other rules are too.
  • Overdue and Due soon exclude each other: a due date that has passed is only Overdue.
  • A complete card never is at risk: one marked complete (dueComplete), one with an end date, or one that is archived.
  • Idle counts whole days since the card's last activity (dateLastActivity, else modifiedAt): floor((now - last) / 1 day).
  • Sent back counts the card's moves where the list it went to is before the list it came from in the board's list order (countBackMoves).
  • The minicard reads only what the minicard already has (dates, checklist counts, dependencies, last activity), so it never counts Sent back; the opened card also counts the moves and so may score one point higher.