Lauri Ojansivu a713154d70 Tick subtasks done from the parent card's Subtasks list, with done/total in its heading.
Each subtask row has a checkbox that marks the subtask card complete
(dueComplete, the card's own "Mark as complete"), and the Subtasks heading
shows "Subtasks (1/3)". A subtask is done when it is marked complete or
archived, which the minicard's subtask badge and "Hide completed subtasks"
now also count.

The setSubtaskDone method checks the edit right on the subtask itself, which
may be on another board; comment-only, read-only, worker and non-members are
refused, an assigned-only member may tick only a subtask assigned to them,
and an archived subtask is refused. The change is recorded in the subtask's
History like the card details toggle.

The new strings are in English in every locale, pending Transifex.

Thanks to zhoujunhaohao and xet7 !

Fixes #4693.
2026-10-10 15:25:16 +03:00

3.6 KiB

Fix: If you are unable to create Subtasks

This can happen on old boards: You have Subtasks board missing.

  1. Create new board similar to your original board, but with ^ at beginning and end of your boardname. For example, if your boardname is MyProject, create new board with name ^MyProject^. At keyboard that character is Shift-^-Space.
Subtask workaround part 1
  1. Set your MyProject board to have subtask board ^MyProject^
Subtask workaround part 2
  1. Now you are able to create Subtasks to your board MyProject.

Subtask status

In the card's Subtasks section, each subtask now shows its current status — the list it currently resides in (for example To Do, In Progress, Done) — read-only next to the subtask title. When a subtask lives on a different board than the parent card, the list name is prefixed with that board's title.

Ticking a subtask done

Each subtask in the card's Subtasks section has a checkbox at the start of its row (#4693). Tick it to mark the subtask done, untick it to mark it not done again. The section heading shows how many are done, for example Subtasks (1/3), and the minicard's subtask badge counts the same.

  • What "done" means. A subtask is a card, and ticking it sets that card's own Mark as complete flag - the same checkbox as in the subtask's card details and on its minicard, the one the rules engine's Mark card complete action and Scrum's default completion policy use. An archived subtask also counts as done, as before; it shows a ticked box that cannot be unticked until the subtask is restored.
  • Who can tick it. Anyone who may edit the subtask card itself. A subtask usually lives on the parent board's subtask board, so what counts is the member's role on that board: board admins and normal members can tick; comment-only, read-only and worker members see the box disabled; an assigned-only member can tick only the subtasks assigned to them. The server checks the same rule, so the box is not the only guard.
  • History. A tick is recorded in the subtask's History (the dates group, like any Mark as complete), with who did it.
  • What is counted. Only the subtasks you can see: a subtask on a board you cannot read is neither shown nor counted.
  • Hide completed subtasks now also hides the subtasks ticked done.

Subtask fixes (upcoming release)

Several long-standing subtask bugs are fixed in the upcoming release:

  • Creating subtasks no longer produces extra swimlanes/columns, and you can create more than one subtask reliably. Subtask creation is now performed server-side, so the default subtasks board / list / swimlane are created once and then reused (this also removes the need for the ^MyProject^ board workaround above on new boards).
  • New subtask cards now receive the destination board's automatic ("always on card") custom fields.
  • The board "Landing list for subtasks deposited here" setting now saves and shows the correct list.
  • The subtask "View it" action now opens the subtask itself instead of the parent card.
  • A circular subtask/parent reference can no longer hang the board.

To focus a board on one project's direct subtasks, open its parent card and choose Card Actions → Filter: Subtasks. Adjust or clear the selection under Filter → Parent card. See Board filters.