As decided on 2026-10-02, a card or swimlane copied or moved to another
board now takes that board's sprint and release of the same name when
exactly one matches: a planned or active sprint, or a release that is
not cancelled. Otherwise they are dropped, as before. Past sprints and
backlog rank always go. This applies to card and swimlane copies,
subtasks copied with their parent, the server hooks behind every move,
and the durable rule copy and move. A move that sets the Scrum revision
itself, as the durable rule move does, is left alone by the hook.
Thanks to xet7 !
A card or swimlane moved to another board kept the sprint, past
sprints, release and backlog rank of the board it left, pointing at
that board's records. A copy there already dropped them. Moves now do
the same, keeping the issue type, acceptance criteria and swimlane
purpose. Server hooks do it, so client, REST and rule moves are all
covered. Scrum fields are not the client's to write, so the
client-callable move does not write them itself. The durable
cross-board rule move writes the same result.
Thanks to xet7 !
Preserve descriptive metadata, reset copied revisions and remove foreign planning references and rank from cross-board card and subtask copies. Full-board copies keep the existing transfer remapper.
Thanks to xet7 !