The write-ahead Sync journal and its stored stages - History, activities,
rules, notifications, webhooks - were built and tested but never called:
manual and scheduled Sync wrote cards directly, so a restart mid-run lost
whatever effects had not happened yet. Maintainer decision of 2026-09-30:
finish the Scrum/Sync handoff by calling the stored stages from both.
A run now takes the durable path when it can do everything
(server/lib/listSyncSteps.js): the board enabled Sync effects (and the
instance enabled cron effects for a scheduled run), the list has a versioned
scope, and every rule action on the board - extra actions included - has a
durable adapter. Only sending email has one, so a board with any other rule
action keeps the direct writes, exactly as before; nothing that ran stops
running.
server/lib/listSyncApplication.js turns the reconcile plan into saved steps
from the stored cards, refusing a local edit made since the fetch as the
direct update would, and carrying custom fields only with a mapped estimate.
Effects are planned once with the shared planner and each step is applied
through the hooked card and activity adapters and durable delivery, as the
actor and trigger that started it. Both paths build the same new card.
A new run first finishes the list's unfinished operation, reusing the list
lease it holds instead of taking it twice. The wekan-list-sync-replay cron
job resumes interrupted operations every minute; intents now record their
trigger (version 2) so a replay runs under the same activation switches. An
operation still preparing has written nothing and is discarded - a replay has
no source data to rebuild it from.
Tests: eligibility for every condition, and step building including the
local-edit refusal (node); the direct-path suite now pins that it never calls
the durable one; a full-app run creates, updates and archives through the
journal, crashes at a card write, replays without duplicate cards or
activities, and falls back to the direct path for a rule action without an
adapter. 565 server tests pass.
Thanks to xet7 !
Sync and the stored rule archive runner fixed each History row's
previousHash and integrityHash when they PLANNED a batch, so the board's
History chain had to stay unchanged from planning until the last row was
written - which needed a multi-row History reservation that would block
or queue ordinary edits, and made a coordinated board refuse Sync.
Maintainer decision of 2026-09-30: plans are content only, and each row
is linked when it is appended, like an ordinary edit.
On a board still on the legacy path, the batch holds one writer token
(so a chain migration drains it) and each row is linked after the
chain's tip - the newest hashed row, then its successors, since the rows
of one batch share a planned createdAt and "newest" alone is a tie that
forks the chain. On a coordinated board each row goes through the chain
head. Appends are idempotent by row _id, and a replay accepts only the
planned content. The archive runner needs no reservation any more; it
captures the actor's redo candidates when it plans. Plans in the old
chained format are refused. An index on (boardId, previousHash) serves
the tip walk.
Unit and MongoDB tests: plans carry no link; rows chain correctly in
both modes and replay once; ordinary History written between planning
and writing is neither blocked nor forked; a coordinated board appends
through the head; old-format plans and adapters without admission or
linking are refused. The full-app archive case now runs without a
reservation and verifies the resulting chain. 561 server tests pass;
the one other failure in that run, the activity notification recovery
scan, is intermittent and passes on its own.
Thanks to xet7 !
Sync writes History rows it hashed when it planned them, straight into
the collection. On a board whose History chain had been migrated to the
coordinated head, that would fork the chain, and a migration could start
while a Sync batch was still writing. persistSyncFieldHistory now writes
only as a writer the History gate admits: production ChangeHistory holds
a legacy writer token for the whole batch, so a migration drains it
first, and a coordinated board refuses Sync History with
sync-history-coordination-required instead of appending around the head.
There is no default: an adapter without admission is refused. The rule
archive path shares it through persistSyncEffects.
A MongoDB integration test uses the real gate: the batch holds a token
while it writes and releases it after; a migration waits for a batch in
flight, a new batch is refused while the board drains, the in-flight one
completes; a coordinated board refuses and writes nothing. Test adapters
gained the pass-through admission; 561 server tests pass.
Thanks to xet7 !