Commit Graph
5 Commits
Author SHA1 Message Date
Lauri Ojansivu 5b3669b00f Page retention sweeps in the full-app tests until their own record is compacted.
A retention sweep reads one page of 100 receipts, oldest first, and keeps its
place. The full-app test database outlives a run, so receipts left by other
suites and earlier runs came to fill the first page, and the webhook test's
single sweep compacted nothing. Production pages through every receipt over
successive sweeps; the tests now do the same through a shared sweepUntil
helper, and assert that their own plan was compacted.

Thanks to xet7 !
2026-09-30 12:17:20 +03:00
Lauri Ojansivu 6ed28c41f7 Run manual and scheduled Sync through the durable journal, with replay.
The write-ahead Sync journal and its stored stages - History, activities,
rules, notifications, webhooks - were built and tested but never called:
manual and scheduled Sync wrote cards directly, so a restart mid-run lost
whatever effects had not happened yet. Maintainer decision of 2026-09-30:
finish the Scrum/Sync handoff by calling the stored stages from both.

A run now takes the durable path when it can do everything
(server/lib/listSyncSteps.js): the board enabled Sync effects (and the
instance enabled cron effects for a scheduled run), the list has a versioned
scope, and every rule action on the board - extra actions included - has a
durable adapter. Only sending email has one, so a board with any other rule
action keeps the direct writes, exactly as before; nothing that ran stops
running.

server/lib/listSyncApplication.js turns the reconcile plan into saved steps
from the stored cards, refusing a local edit made since the fetch as the
direct update would, and carrying custom fields only with a mapped estimate.
Effects are planned once with the shared planner and each step is applied
through the hooked card and activity adapters and durable delivery, as the
actor and trigger that started it. Both paths build the same new card.

A new run first finishes the list's unfinished operation, reusing the list
lease it holds instead of taking it twice. The wekan-list-sync-replay cron
job resumes interrupted operations every minute; intents now record their
trigger (version 2) so a replay runs under the same activation switches. An
operation still preparing has written nothing and is discarded - a replay has
no source data to rebuild it from.

Tests: eligibility for every condition, and step building including the
local-edit refusal (node); the direct-path suite now pins that it never calls
the durable one; a full-app run creates, updates and archives through the
journal, crashes at a card write, replays without duplicate cards or
activities, and falls back to the direct path for a rule action without an
adapter. 565 server tests pass.

Thanks to xet7 !
2026-09-30 11:29:44 +03:00
Lauri Ojansivu bb591c448a Compact delivered Sync notification plans after 90 days.
Maintainer decision of 2026-09-30: receipts are compacted after 90 days to a
permanent minimal id and outcome, notification plans included. A stored Sync
notification plan keeps every recipient's rendered subject and HTML, and had
no completion evidence of its own, so it could never be told finished and
was kept forever.

Delivery now writes a receipt once it is confirmed - planId, activity hash,
plan checksum and completedAt; the first stored receipt wins. After
SYNC_RECEIPT_METADATA_DAYS (90) an hourly sweep replaces the exact plan the
receipt was written for with { _id, activityHash, checksum,
compactReceiptVersion } in place, so its id stays taken. A replay that finds
the compact form returns as delivered and never rebuilds or resends; within
the period a replay still re-checks every recipient, as before. A compact
plan without its matching receipt, or for changed activity content, is
refused.

The other receipt rows named in the decision - Scrum completions and
requests, Sync operation intents and completions - already hold only ids,
hashes and timestamps, so there is nothing in them to compact.

MongoDB tests cover what is compacted and what is not, idempotence, replay
of the compact form and the refusals; the full-app delivery test compacts a
real delivered plan and replays it without sending.

Thanks to xet7 !
2026-09-30 11:12:25 +03:00
Lauri Ojansivu 24536f6cbd Keep Sync's rule, notification and webhook effects off unless enabled.
Maintainer decision of 2026-09-30: running rules, notifications and
webhooks for changes that Sync makes is off by default. A board opts in
with syncEffectsEnabled, and scheduled runs additionally need the new
instance flag enableSyncCronEffects, so an upgrade changes nothing on
its own. Every stored-effect stage (rules, rule email and archive,
notifications, webhooks) now requires its caller to name the trigger,
manual or scheduled, and checks both switches inside its guard with the
board it re-read, so whatever later wires Sync to these stages cannot
skip them. The switches have no interface yet: the stages are not
called by Sync until the History coordination they wait on is done, and
a toggle that does nothing would mislead.

tests/syncActivation.test.cjs pins the decision, the defaults and that
each stage checks it; the full-app suite refuses a missing trigger, a
board that has not opted in and a scheduled run without the instance
switch, writing nothing, then succeeds once both are on. 560 server
tests pass.

Thanks to xet7 !
2026-09-30 02:00:42 +03:00
Lauri Ojansivu 1c59d5d07e Connect saved notification plans to private storage and live replay permissions 2026-09-28 05:18:10 +03:00