Commit Graph
10 Commits
Author SHA1 Message Date
Lauri Ojansivu ef54907836 Import Scrum planning into an existing board.
Every Scrum import used to create a new board. A board administrator can
now import a native wekan-scrum-2 transfer, or a WeKan board export, into
a board that already exists, from the Sprints view: Preview shows what
would change and writes nothing, Import writes it.

Sprints and releases are matched by ID on this board, then by
provenance, then by a name exactly one record has on each side; the rest
are created once with the source's provenance, so importing the same
file again changes nothing. Cards are matched by ID, or by card number
and title, and never created; unmatched, ambiguous and other boards'
cards are reported and left alone. Matched cards get the file's sprint,
releases, backlog rank, issue type and acceptance criteria; a move into a
finished sprint is refused. The writes go through the journaled Scrum
import stage, so an interrupted import is finished or discarded the same
way, and are recorded as one Scrum History change.

Thanks to xet7 !
2026-10-08 12:36:57 +03:00
Lauri Ojansivu 727ceedd01 Let a card be in more than one release.
A card had exactly one release, scrum.releaseId. Jira import kept only the
first fix version of an issue and reported the rest as lost, Jira export
wrote no fix versions at all, and the card UI could not show or pick more
than one release.

A card's releases are now a list, scrum.releaseIds, with releaseId kept as
its first entry so older servers, importers and REST readers still see one.
Existing cards are not migrated: every reader goes through cardReleaseIds(),
which reads the list and the old single field the same way, so cards saved
either way work side by side, and a card moves to the new form on its next
Scrum save. A save with releaseIds replaces the list; a save with only
releaseId, from an older client, replaces the first release and keeps the
others, and null clears them. Every release must belong to the board,
checked in one query; duplicates collapse and a releaseId that contradicts
the list is refused.

Copies and moves to another board link each release by name. The native
transfer writes one release exactly as before and adds releaseIds only for
cards with several, and remaps each of them on import. Jira import maps every
fix version and Jira export writes them all as fixVersions. Board View /
Sprints shows each release's cards and how many are done, counting a card in
each of its releases. Scrum History checks and guards every release, and
rule e-mails name them all. The Product Backlog and card details use a
multiple select.

tests/scrumMultipleReleases.test.cjs covers the rules and fails if any code
reads the single field directly; a Playwright spec drives the UI. New text is
in English, pending Transifex.

Thanks to xet7 !
2026-10-08 11:51:44 +03:00
Lauri Ojansivu 13c8d563ea Lift the sprint card cap: chunked rollover plans and History, daily rows.
A sprint over 10,000 cards was refused at start and close. With the
snapshot rows already outside the sprint document, the rest now is too:

- The rollover plan of a close goes to its own collection,
  scrumRolloverRows, in chunks bounded by rows and bytes; the sprint keeps
  only rolloverPending: true. A chunk is applied, its cards read at once,
  and removed; the mark is cleared when none is left. A plan kept in the
  sprint document before this is still finished as it was.
- A Scrum History batch too large for one row is recorded as several rows
  sharing a batchId, each at most 1,000 records and 3 MB a side. A record
  is in exactly one row, and undo and redo walk the whole batch, with or
  without a request ID, so one undo still reverses a whole close.
- Daily burndown observations keep their rows in scrumSnapshotRows too.
- No 10,000-card limit is left: snapshot inputs, daily capture, scope
  replay, the daily report and the transfer read every card.

Undoing a batch re-hashed its whole History row and sent its whole plan as
a selector before every record write, so a 1,500-card undo took four
minutes. The row is now checked whole when the operation begins and by
its identity fields after that, and the worker check uses the plan's
identity and the worker's random id - nothing ever rewrites a pending
plan. A 10,500-card sprint closes in 8 s and undoes in 44 s.

Thanks to xet7 !
2026-10-03 01:47:19 +03:00
Lauri Ojansivu abda8c4e0f Export and copy Scrum boards whose records carry an incarnation.
Since Scrum records got a per-lifetime incarnation (20275418d4), the Scrum
transfer normalizer refused it as an unknown field, so board export and
board copy of any Scrum board with a sprint, release or event answered 500.
The transfer drops it, as Scrum History does.

Thanks to xet7 !
2026-10-02 12:54:20 +03:00
Lauri Ojansivu 3fe5786184 Preserve daily Scrum observations in native transfer and board copies
Introduce version 2 while accepting version 1 imports. Remap snapshot references, retain measured epochs and partial-data notices, bound transfer sizes, and prevent collectors from observing unfinished imports.

Thanks to xet7 !
2026-09-27 22:32:15 +03:00
Lauri Ojansivu 05e8bce70e Validate native Scrum snapshot lifecycle consistency
Reject contradictory sprint states and snapshot timestamps before native import writes. Preserve valid active and cancelled history and cover import and board-copy round trips.

Thanks to xet7 !
2026-09-27 20:47:55 +03:00
Lauri Ojansivu d269c8c705 Validate compatible Scrum snapshot policies during native transfer
Reject mixed units, estimate sources, custom fields and completion policies before importing a board instead of combining unlike historical totals.

Thanks to xet7 !
2026-09-27 20:15:33 +03:00
Lauri Ojansivu 196faa9cd5 Retain sprint calendars and report planned working days
Snapshot the configured workweek and use the start calendar for inclusive planned date counts. Preserve legacy unknowns, validate transferred calendars and include counts in reports and exports.

Thanks to xet7 !
2026-09-27 20:03:54 +03:00
Lauri Ojansivu e0863b35cd Restore native Scrum data through the board import pipeline
Validate before import side effects, allocate destination planning IDs and remap cards, lists, fields, users and snapshots. Preserve source provenance and expose bounded loss reports to board administrators without granting permissions.

Thanks to xet7 !
2026-09-27 18:33:16 +03:00
Lauri Ojansivu 2ff6877561 Define validated Scrum transfer data and reference remapping
Prepare shared native transfer, duplication and adapter validation with explicit partial-data losses. Reject invalid snapshots, foreign planning references and ID collisions. Runtime integration remains tracked in the Scrum design.

Thanks to xet7 !
2026-09-27 18:06:47 +03:00