Two Scrum meeting helpers, offline and with no AI
(models/lib/scrumMeetings.js, docs/Features/Scrum/Meetings.md):
- Daily standup: the board's active members in a shuffled order, each
with the same timebox (Minutes per person in the Scrum settings, 1-15,
2 by default), counted down and red once over; Next hands over, and the
end says how long it took. It runs in the browser and writes nothing.
- Retrospective board: a new private board, titled with this board's name
and the day, with the lists Start doing, Stop doing, Keep doing and
Action items, made through createBoardWithInitialSwimlanes so "who may
create boards" applies.
Both are in the board menu for every member, next to Summary. Each is
turned off for one board in its Scrum settings and for the instance in
Admin Panel / Settings / Visibility / Features. Translated in every
language.
Thanks to xet7 !
Kanban practices for a board's lists (models/lib/boardFlowPolicies.js,
docs/Features/Lists/Flow-Policies.md), offline and with no AI:
- List policy: each list's own entry and exit criteria, written from the
list menu and shown as a gavel at the list header, its tooltip the text.
- Commitment point: the list from which work is committed to, flagged at
its header; the lists before it are options.
- WIP limit per person: how many open cards one person may hold on the
board; an opened card names each of its people over it.
Each is off until a board admin turns it on in Board Settings / List, and
each is a feature of Admin Panel / Settings / Visibility / Features, which
hides it on every board.
The Scrum settings get a Definition of Ready beside the Definition of
Done, and both are now readable by every member in the Scrum views once
written. The four Scrum translation guards count 128 keys with it.
Translated in every language.
Thanks to xet7 !
- A card put into a release created after the card fields had cached the
board's sprint and release names showed "Release:" with no name: saving a
sprint or release does not change the board's revision the cache is keyed
by. A shown record that names an ID the cache does not have now asks
again, at most once per 30 s per set of missing IDs (models/lib/scrum.js
unknownScrumNameIds).
- Importing Scrum planning into an existing board never showed its preview,
and the Scrum import report showed every loss line empty: their helpers
were registered on scrumReportTable instead of scrumView, which draws
them. The preview also read its counts through scrumView's own helpers of
the same names, and the import's refresh closed the panel before its
result was seen; both are fixed.
tests/scrumViewHelpers.test.cjs checks every Scrum template registers the
helpers its own markup uses.
Thanks to xet7 !
A card had exactly one release, scrum.releaseId. Jira import kept only the
first fix version of an issue and reported the rest as lost, Jira export
wrote no fix versions at all, and the card UI could not show or pick more
than one release.
A card's releases are now a list, scrum.releaseIds, with releaseId kept as
its first entry so older servers, importers and REST readers still see one.
Existing cards are not migrated: every reader goes through cardReleaseIds(),
which reads the list and the old single field the same way, so cards saved
either way work side by side, and a card moves to the new form on its next
Scrum save. A save with releaseIds replaces the list; a save with only
releaseId, from an older client, replaces the first release and keeps the
others, and null clears them. Every release must belong to the board,
checked in one query; duplicates collapse and a releaseId that contradicts
the list is refused.
Copies and moves to another board link each release by name. The native
transfer writes one release exactly as before and adds releaseIds only for
cards with several, and remaps each of them on import. Jira import maps every
fix version and Jira export writes them all as fixVersions. Board View /
Sprints shows each release's cards and how many are done, counting a card in
each of its releases. Scrum History checks and guards every release, and
rule e-mails name them all. The Product Backlog and card details use a
multiple select.
tests/scrumMultipleReleases.test.cjs covers the rules and fails if any code
reads the single field directly; a Playwright spec drives the UI. New text is
in English, pending Transifex.
Thanks to xet7 !
A sprint over 10,000 cards was refused at start and close. With the
snapshot rows already outside the sprint document, the rest now is too:
- The rollover plan of a close goes to its own collection,
scrumRolloverRows, in chunks bounded by rows and bytes; the sprint keeps
only rolloverPending: true. A chunk is applied, its cards read at once,
and removed; the mark is cleared when none is left. A plan kept in the
sprint document before this is still finished as it was.
- A Scrum History batch too large for one row is recorded as several rows
sharing a batchId, each at most 1,000 records and 3 MB a side. A record
is in exactly one row, and undo and redo walk the whole batch, with or
without a request ID, so one undo still reverses a whole close.
- Daily burndown observations keep their rows in scrumSnapshotRows too.
- No 10,000-card limit is left: snapshot inputs, daily capture, scope
replay, the daily report and the transfer read every card.
Undoing a batch re-hashed its whole History row and sent its whole plan as
a selector before every record write, so a 1,500-card undo took four
minutes. The row is now checked whole when the operation begins and by
its identity fields after that, and the worker check uses the plan's
identity and the worker's random id - nothing ever rewrites a pending
plan. A 10,500-card sprint closes in 8 s and undoes in 44 s.
Thanks to xet7 !
The Scrum fields were a separate "Scrum settings" checkbox list under
each column of Board Settings / Card, and drawn as one block on the card
and the minicard. Each is now a row of both columns - "Scrum settings:
Sprint", "Scrum settings: Release" and so on - ordered with the other
rows, and drawn on the card and the minicard where the board's order puts
it; by default where the block was. The minicard gained Past sprints and
Acceptance criteria. The minicard's work item type row is the switch of
the work item type badge, which stays on unless turned off. The column
actions set the Scrum rows too, through scrum.configure so its lock,
revision and Scrum history apply.
Thanks to xet7 !
Fetch projected inputs with an overflow sentinel before start or close, reject oversized card/list sets without partial snapshots, and index done-list membership once. Cover exact limits and unchanged lifecycle/History on rejection with unit and Chromium tests.
Thanks to xet7 !
Allow clearing rank metadata, retain zero as an explicit rank and avoid negative board positions blocking unrelated Scrum edits. Verify History and native transfer preserve cleared values.
Thanks to xet7 !
Snapshot the configured workweek and use the start calendar for inclusive planned date counts. Preserve legacy unknowns, validate transferred calendars and include counts in reports and exports.
Thanks to xet7 !
Reuse board permissions, card estimates and chart exports for Product Backlog, Sprints, Sprint Report and Velocity views. Add revision-checked sprint lifecycle, recoverable rollover, release/event creation and independently hidden metadata controls. Explicitly label assigned-only reports as partial.
Verified 12 focused Node checks, a real Meteor/Mongo lifecycle regression and three Chromium scenarios including settings visibility, denial paths and actual Excel/PDF files. History integration, full transfer mappings and further report/editor work remain tracked in the Scrum design.
Thanks to xet7 !